Claims adjuster
The Get It Right Initiative (GIRI) in 2024 published 'The GIRI Insurance Guide: A perspective on risk management for construction projects' describes a claims adjuster as someone who 'decides how much an insurance company should pay for a claim; reviewing the details of the case, determining the liability and issuing an offer to the customer. If this offer is rejected, the adjuster may negotiate or seek further input from legal specialists.'
A loss adjuster is defined as: ‘an independent professional individual who is engaged by insurers to settle large or complex claims.' b the Insurance Policyholder Taxation Manual, published by HM Revenue & Customs on 19 March 2016.
[edit] Related articles on Designing Buildings
- Building Users' Insurance Against Latent Defects.
- Collateral warranties.
- Contractors' all-risk insurance.
- Contract works insurance.
- Counter Terrorism Security Advisor.
- Decennial liability.
- Design liability.
- Directors and officers insurance.
- Employer's liability insurance.
- Excepted risk.
- Fire safety exclusions - the insurance position.
- Flood insurance.
- Future of construction insurance.
- Indemnity to principals.
- Insurance certificate.
- Insurance for building design and construction.
- Insurer of last resort.
- Integrated project insurance.
- JCT Clause 6.5.1 Insurance.
- Joint names policy.
- Latent defects insurance.
- Legal indemnity insurance.
- Non-negligent liability insurance.
- Plant and equipment insurance.
- Professional Indemnity Insurance.
- Public liability insurance.
- Residual value insurance.
- Reverse premium.
- Self build insurance.
- Self insurance.
- Specified perils.
- Subcontractor default insurance (SDI).
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.